You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Breakwater di Sisi Utara Pulau Untung Jawa Rampung

Breakwater Repair on North Side of Untung Jawa Island Completed

The Thousand Islands Water Resources (SDA) Sub-agency has repaired the breakwater on north side of Untung Jawa Island, Utung Jawa Island Urban Village, South Thousand Islands Sub-district.

This repair conducted by seven personnel is done up to 700 meters

Thousand Islands SDA Sub-agency Head, Hendri said the repair focused on 617 tetrapods that hit by the waves.

"This repair conducted by seven personnel is done up to 700 meters. It conducted in October and completed on December 4," he expressed, Tuesday (12/7).

Breakwater Built on the East Side of Sebira Island

By doing so, it was expected to make the breakwater stronger to withstand high waves and prevent beach abrasion.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1419 personFolmer
  2. Jakarta Waives Motor Vehicle Tax Fines and Title Transfer Fees

    access_time01-06-2026 remove_red_eye858 personAldi Geri Lumban Tobing
  3. Commemorating Vesak, Jakarta Lights Up with Illumination of Jakarta 2026

    access_time30-05-2026 remove_red_eye653 personBudhi Firmansyah Surapati
  4. Seniors Participate in Pasti Bisa Berkarya at MRT Stations

    access_time02-06-2026 remove_red_eye604 personAldi Geri Lumban Tobing
  5. Krendang Fire Victims Receive Proper Support and Assistance

    access_time29-05-2026 remove_red_eye477 personBudhi Firmansyah Surapati